To improve your shopping experience today and in the future, this site uses cookies.
I Accept Cookies
A modern, minimalist design, achieving a five-star safety rating from Virginia Tech.
A modern, minimalist design, achieving a five-star safety rating from Virginia Tech.
Troy Lee Designs

Troy Lee Designs Flowline SE MIPS Helmet in Stealth Black

£79.00 £140.00 44% off
Earn
in Customer Rewards when you buy this item today
Pre-Order

With Pre-Order, you can purchase the latest items added to our store in advance of them arriving with us.

Your Pre-Order is prioritised (at no additional charge); meaning that as soon as the product arrives with us, we can wrap it straight back up; ready for collection via Click & Collect or despatch to you — it often never even hits the stock room shelves!

Pre-Launch

With Pre-Launch, the date when we expect to receive the product ourselves is still a little too hazy to be confident in accepting Pre-Orders.

So, instead, you can submit your email address against the item you are interested in and we will email you as soon as stock arrives on the system.

Estimated Delivery & Collection Dates

Estimated Delivery & Collection Dates are given on Pre-Order and Pre-Launch products. They are for indication purposes only and can change at any time without notice.

The dates we provide are based on indications given by our suppliers. Whenever we get updated information from our suppliers we will endeavour to update the Estimated Delivery & Collection Dates provided on product pages.

We estimate this will be ready for despatch to you or collection via Click & Collect on Undetermined
Earn Rewards
When you purchase this item, you will earn of rewards points to spend on your next purchase from us. You can spend your Rewards balance in-store & online.

Hassle free returns

In the unlikely event that you are not satisfied with your purchase please feel free to return your items within 90 days of the purchase date for a full exchange or refund. Any item (excluding food, underwear or e-gift vouchers) can be returned to us for any reason within 90 days, provided that the item has not been used or fitted and is returned in its original packaging with valid proof of purchase.

It is recommended that you use a recorded delivery service or return to a store to ensure your items are received by us. We cannot assume responsibility for items that are lost in transit back to us.




Terms & Conditions

Items must be returned in their original packaging and unused. Refunds will be issued once the product(s) have been received and inspected.

Click & Collect customers can buy with confidence knowing that they can review the item before deciding whether it is right for you before leaving the store. Should you decide it's not right for you, it can be conveniently exchanged or refunded straight away, or you still have up to 90 days to return it if you are still unsure.

Please note:
1. If the items we have sent you are faulty, damaged or not as we described, we will cover the cost of collection and the delivery of the correct item.

2. If we have delivered the correct bike but upon inspection, you decide the bike is not the one for you, we will charge you £50 for collection (£100 from Northern Ireland). If you do not have the original box in usable condition, we will charge you an additional £15 to provide one.

Refunds will be processed using the same method of payment used for the original purchase. Credit & debit card refunds must be made to the card used for the original purchase.

We are unable to offer a refund without a valid proof of purchase.

Troy Lee Designs Flowline SE MIPS Helmet in Stealth Black

Season:All Year Round

Brand:Troy Lee Designs

Code:TLD11043700

The Flowline SE MIPS Helmet, Troy Lee Designs’ new half shell trail helmet, includes some of the best technology Troy Lee Designs has to offer. Sporting a modern, minimalist look, it is designed to keep you safe and comfortable on the trail.

Safety is of course the top priority of any off-road helmet, and the Flowline SE doesn’t disappoint on this score. Equipped with MIPS® in a low-key black shade, it will guard your brain from rotational impact in the event of a collision.

Meanwhile, dual density EPS will work to reduce the energy transfer during either high and low speed impacts, so that your head will be protected, whether you lose your balance on slippery ground or encounter an obstacle.

Extended coverage at the back of the head and an outer shell, sturdily made using full wrap in-mould construction, reinforce these defences.

Comfort is the next most important consideration in any trail helmet. The Flowline SE MIPS can be adjusted to fit securely using Troy Lee Designs’ precision fit system, with three height settings that quickly and simply tighten or loosen the Flowline SE to suit.

Once you’re moving, 14 high-flow ventilation ports will keep the air flowing over your scalp, keeping your head deliciously dry and cool, even when you’re putting effort into shredding or climbing. If you do start to sweat, the helmet will remain fresh thanks to the antimicrobial, odour fighting comfort liner, which will also provide soft cushioning throughout your ride.

The Flowline SE MIPS Helmet is finished off by the same easy-to-use Fidlock magnetic buckle system found on the A3, which can be opened and shut with just one hand or while wearing gloves, and a screwless visor with smooth three-position adjustment that will protect your eyes while riding and soak up impact during an off.

All in all, this helmet offers incredible value, protection, comfort and performance in the form of a sleek, understated bi-colour helmet that will nonetheless make a statement on the trails or in the bike park, thanks to Troy Lee’s famously contemporary styling.

Features:
  • With MIPS technology to protect against rotational forces
  • Dual density EPS foam guards against high and low speed impacts
  • Outer shell strengthened by full wrap, in-mould construction
  • Extended coverage guards the back of your head
  • Easy to size using the TLD precision fit system
  • 14 high-flow ventilation ports keep your head cool and dry
  • With soft, antimicrobial comfort liner
  • Fidlock magnetic buckle system of easy on-off
  • With 3-position adjustable, screwless visor
Troy Lee Flowline Helmet Sizes
Sizing Information
Professional Opinion
Question(s) answered about Troy Lee Designs Flowline SE MIPS Helmet in Stealth Black
Ask a question
Question(s) asked regarding Troy Lee Designs Flowline SE MIPS Helmet in Stealth Black

Ask a question

Your name
Your email address
Your phone number
Your question
Submit Question  Close
Home Mountain Biking Helmets & Protection Troy Lee Designs Helmets